Project Overview
This Data Center Facility will open facilities in Riyadh and Dammam, Kingdom of Saudi Arabia (KSA). Expanding the data centres from 20 MW to 55 MW. This facility announced the addition of 35 megawatts of IT capacity at LEAP 2023, bringing the total IT capacity under construction to 55 megawatts, with the initial 20 megawatts already underway.
Utilizing ABB System Pro E, which is engineered to satisfy all electrical installation requirements concerning protection degree, segregation form, and electrical characteristics, adhering to the latest international standards and working in perfect harmony with all ABB’s low voltage equipment.
Key Details
Category
Data Centers
Location
Riyadh, KSA
Year
2023
Project Scope
LV Switchgear, SMBD, PFC, ATS, DBs & AHF
End User
EDGNEX
Products Used in This Project
Explore the EAMFCO-manufactured electrical products deployed in this installation.
Low Voltage Switchboards
Custom electrical assembly engineered to documented project requirements.
Automatic Transfer Switch (ATS)
Custom electrical assembly engineered to documented project requirements.
Power Factor Correction Panel (APFC)
Custom electrical assembly engineered to documented project requirements.
Type Tested Panels
Custom electrical assembly engineered to documented project requirements.
Project Gallery