Project Overview
System pro E power is the innovative ABB’s main distribution switchboard solution with rated current up to 6300A and short-circuit current up to 120kA. Designed to easily fulfill all electrical installation requirements in terms of protection degree, segregation form and electrical characteristics, according to the latest international standards and in perfect synergy with all ABB’s low voltage equipment.
EAMFCO provided critical electrical infrastructure for the STC New Era Data Center, a significant development for Saudi Arabia's digital future. Our contribution included the design, manufacturing, and installation of LV Switchgear, Automatic Transfer Switches (ATS), Power Factor Correction (PFC) panels, and Distribution Boards (DBs). These systems are crucial for ensuring uninterrupted power and efficient operation within a modern data center environment.
Key Details
Category
Data Centers
Location
Dammam/Jeddah, KSA
Year
2023
Project Scope
LV Switchgear, ATS, PFC & DBs
End User
STC Saudi Arabia
Products Used in This Project
Explore the EAMFCO-manufactured electrical products deployed in this installation.
Low Voltage Switchboards
Custom electrical assembly engineered to documented project requirements.
Automatic Transfer Switch (ATS)
Custom electrical assembly engineered to documented project requirements.
Power Factor Correction Panel (APFC)
Custom electrical assembly engineered to documented project requirements.
Type Tested Panels
Custom electrical assembly engineered to documented project requirements.
Project Gallery










